1. Executive Summary
- Findings - Identification of equipment locations with highest incident energy levels, total number of overcurrent protective devices with inadequate short circuit current interrupting ratings, coordination discrepancies and identification of equipment protective boundary conflicts
- Recommendations - Actions required to mitigate each specific problem found.
2. Introduction
- Objective
- Methodology
3. Short-Circuit Study
- Methodology
- Utility Source Impedance Information
- ANSI Complete Fault Report - Low Voltage 3 Phase and Unbalanced Report, Momentary 3 Phase, Momentary Unbalanced, and Interrupting 3 Phase and Unbalanced
4. Equipment Evaluation
- Devices Failed Equipment Evaluation
5. Protective Device Coordination Study
- Methodology
- Coordination Discrepancies
- Time Current Curves
6. Arc Flash Hazard Analysis
- Methodology
- Results
7. Input Data
- Assumptions
- Input Report
- Protective Device Settings
- One-Line
8. References
- Acknowledgements
- Bibliography